---
title: Translation Language Translation for Emergency Services
description: Discover how translation language translation transforms emergency communication, enabling multilingual 911 services across 185+ languages.
image: https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/f2caa214-9521-49bd-87b3-95ac11c2179d/inline-1-1771489004220.jpg
---

[Skip to content](https://www.convey911.com/blog/translation-language-translation#main-content)

[![Convey911 Logo](https://www.convey911.com/hs-fs/hubfs/Convey911%20Logo.png?width=1873&height=599&name=Convey911%20Logo.png)](https://www.convey911.com)

- Solutions
  
  Show submenu for Solutions 
  
    - [ConveyPrizym](https://www.convey911.com/conveyprizym)
    - [ConveyConnect](https://www.convey911.com/convey-connect-fast-reliable-access-to-human-language-interpreters)
- About
  
  Show submenu for About 
  
    - [Blog](https://www.convey911.com/blog)
    - [Company](https://www.convey911.com/about)
    - [Contact Us](https://www.convey911.com/contact)
- [FAQ](https://www.convey911.com/frequently-ask-questions)
- [Login](https://sso.convey911.com/login?state=hKFo2SBUb1F5bEdrZUNlSWl2VGRWMWE1Y3Q4S0xfX3JMMGRHcKFupWxvZ2luo3RpZNkgc0J2RHo0Y0F3cXhMaUVBVWM0bFlURmtSOGZ2Q0JFSTajY2lk2SBhMEwxUXdSQUl0RllKRDJjMVlVc21icWF1RHVsaXBLeg&client=a0L1QwRAItFYJD2c1YUsmbqauDulipKz&protocol=oauth2&clientId=a0L1QwRAItFYJD2c1YUsmbqauDulipKz&audience=https%3A%2F%2Fapi.convey911.com&redirect_uri=https%3A%2F%2Fportal.convey911.com&scope=openid%20profile%20email&response_type=code&response_mode=query&nonce=RG9uNHVKVU9yZGFMUDY0QWlma3NTdXFCd2E5MkxGY3dNcFBiS1VEbWVSYg%3D%3D&code_challenge=UWGPz_xRAQfk_q4e4_KxdCiKqdw0Y6dTyBiXGgi71ow&code_challenge_method=S256&auth0Client=eyJuYW1lIjoiYXV0aDAtc3BhLWpzIiwidmVyc2lvbiI6IjEuMjEuMCJ9)

Open main navigation

Close main navigation

- Solutions
  
  Show submenu for Solutions 
  
    - [ConveyPrizym](https://www.convey911.com/conveyprizym)
    - [ConveyConnect](https://www.convey911.com/convey-connect-fast-reliable-access-to-human-language-interpreters)
- About
  
  Show submenu for About 
  
    - [Blog](https://www.convey911.com/blog)
    - [Company](https://www.convey911.com/about)
    - [Contact Us](https://www.convey911.com/contact)
- [FAQ](https://www.convey911.com/frequently-ask-questions)
- [Login](https://sso.convey911.com/login?state=hKFo2SBUb1F5bEdrZUNlSWl2VGRWMWE1Y3Q4S0xfX3JMMGRHcKFupWxvZ2luo3RpZNkgc0J2RHo0Y0F3cXhMaUVBVWM0bFlURmtSOGZ2Q0JFSTajY2lk2SBhMEwxUXdSQUl0RllKRDJjMVlVc21icWF1RHVsaXBLeg&client=a0L1QwRAItFYJD2c1YUsmbqauDulipKz&protocol=oauth2&clientId=a0L1QwRAItFYJD2c1YUsmbqauDulipKz&audience=https%3A%2F%2Fapi.convey911.com&redirect_uri=https%3A%2F%2Fportal.convey911.com&scope=openid%20profile%20email&response_type=code&response_mode=query&nonce=RG9uNHVKVU9yZGFMUDY0QWlma3NTdXFCd2E5MkxGY3dNcFBiS1VEbWVSYg%3D%3D&code_challenge=UWGPz_xRAQfk_q4e4_KxdCiKqdw0Y6dTyBiXGgi71ow&code_challenge_method=S256&auth0Client=eyJuYW1lIjoiYXV0aDAtc3BhLWpzIiwidmVyc2lvbiI6IjEuMjEuMCJ9)
- [Request a Demo](https://www.convey911.com/request-a-demo-convey911-communications-and-language-translation)

[Request a Demo](https://www.convey911.com/request-a-demo-convey911-communications-and-language-translation)

 Feb 23, 2026, 3:49:57 PM

# Translation Language Translation for Emergency Services

![Picture of Patrick Rife](https://app.hubspot.com/settings/avatar/d49caa125915a087c6e43ac68f945642) [Patrick Rife](https://www.convey911.com/blog/author/patrick-rife)

Share: [facebook-f icon](http://www.facebook.com/share.php?u=https://www.convey911.com/blog/translation-language-translation) [linkedin-in icon](http://www.linkedin.com/shareArticle?mini=true&url=https://www.convey911.com/blog/translation-language-translation) [Twitter icon](https://twitter.com/intent/tweet?url=https://www.convey911.com/blog/translation-language-translation) [pinterest-p icon](http://pinterest.com/pin/create/link/?url=https://www.convey911.com/blog/translation-language-translation) [envelope icon](mailto:?body=https://www.convey911.com/blog/translation-language-translation)

Emergency communication transcends language barriers when lives hang in the balance. Translation language translation has evolved from a supplementary service to an essential component of modern emergency response systems, particularly in diverse communities where first responders encounter dozens of languages daily. As public safety agencies increasingly serve multilingual populations, the integration of sophisticated translation language translation technology becomes not just beneficial but critical for effective emergency management and community safety.

## Understanding Translation Language Translation in Emergency Contexts

Translation language translation represents the complete process of converting messages from a source language into a target language while preserving meaning, context, and urgency. In emergency situations, this process must occur with exceptional speed and accuracy. Unlike traditional translation scenarios where documents can undergo multiple review cycles, emergency translation language translation requires instantaneous conversion that maintains the caller's intent and critical details.

![Real-time translation workflow](https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/f2caa214-9521-49bd-87b3-95ac11c2179d/inline-1-1771489004220.jpg)

The [source text](https://en.wikipedia.org/wiki/Source_text) in emergency communications often contains fragmented sentences, emotional content, and location-specific terminology that standard translation tools struggle to interpret. Emergency-focused translation language translation systems must account for these challenges while maintaining HIPAA compliance and ensuring data security. Modern solutions integrate neural machine translation with emergency-specific language databases, creating hybrid systems that understand both linguistic nuance and emergency terminology.

### Core Components of Emergency Translation Systems

Effective translation language translation platforms for emergency services incorporate several essential elements. These systems require robust architecture capable of handling simultaneous connections, real-time processing, and seamless integration with existing emergency infrastructure.

**Key technical requirements include:**

- Sub-second latency for real-time communication
- Accuracy rates exceeding 95% for emergency terminology
- Support for text, voice, and video translation
- Integration with Computer-Aided Dispatch (CAD) systems
- Secure, HIPAA-compliant data handling
- Redundant systems for continuous availability

The [text-to-911 cloud-based service](https://www.convey911.com/text-to-911-cloud-based-tcc-service-integrated-language-translation) demonstrates how modern platforms combine these components to deliver comprehensive emergency communication solutions. These systems must process diverse input formats while maintaining translation consistency across channels.

## Technical Architecture of Translation Language Translation Platforms

Modern translation language translation infrastructure relies on sophisticated technological frameworks that balance speed, accuracy, and reliability. The architecture typically consists of multiple layers, each addressing specific aspects of the translation process while maintaining system resilience during high-stress emergency scenarios.

| System Layer | Primary Function | Emergency Application |
| --- | --- | --- |
| Input Processing | Receives and normalizes source content | Handles multiple input methods (text, voice, video) |
| Translation Engine | Converts source to target language | Processes emergency terminology with context awareness |
| Quality Assurance | Validates translation accuracy | Flags potentially critical mistranslations |
| Delivery System | Transmits translated content | Integrates with dispatch consoles and responder devices |
| Logging & Analytics | Records all transactions | Maintains audit trails for legal compliance |

Neural machine translation has revolutionized translation language translation capabilities, particularly for emergency services. These systems learn from vast datasets, including emergency-specific corpora, enabling them to recognize patterns and terminology unique to crisis situations. The [DGT-Translation Memory](https://translation.ec.europa.eu/tools-and-resources/resources-language-professionals_en) exemplifies how large-scale translation databases support multilingual communication across complex organizational structures.

### Integration with Emergency Communication Infrastructure

Translation language translation platforms must seamlessly connect with existing emergency systems without disrupting established workflows. [Emergency communication workflows](https://www.convey911.com/blog/emergency-communication-workflow) depend on integration points that allow translation services to enhance rather than complicate dispatch operations.

Modern platforms achieve this through API-based architectures that connect to:

1. **E911 systems** for automatic location identification
2. **CAD platforms** for incident management and documentation
3. **Radio systems** for field communication
4. **Mobile data terminals** for responder access
5. **Recording systems** for quality assurance and legal compliance

The challenge of maintaining translation language translation quality while processing emergency communications at scale requires sophisticated load balancing and resource allocation. Peak demand periods during large-scale emergencies can strain translation systems, making redundancy and scalability critical design considerations.

## Language Coverage and Emergency Service Requirements

Comprehensive translation language translation services for emergency response must support extensive language portfolios. While English, Spanish, and Mandarin represent the most common languages in many jurisdictions, effective emergency services require coverage extending to refugee languages, indigenous dialects, and emerging community languages.

Research on [multilingual translation memory databases](https://arxiv.org/abs/1309.5226) demonstrates the complexity of maintaining quality across language pairs. Emergency services face unique challenges because low-frequency language pairs may lack sufficient training data, yet responders must communicate effectively regardless of caller language.

### Strategic Language Prioritization

Agencies implementing translation language translation systems must balance comprehensive coverage with practical resource allocation. This involves analyzing community demographics, recent immigration patterns, and historical call data to prioritize language support.

**Effective prioritization strategies include:**

- **Tier 1 languages**: Immediate, real-time machine translation (covering 80%+ of calls)
- **Tier 2 languages**: Machine translation with human interpreter backup
- **Tier 3 languages**: Human interpreter connection within 60 seconds
- **Specialized dialects**: Pre-identified interpreter network for rare languages

The [multilingual communication](https://www.convey911.com/blog/multilingual-communication) framework ensures that no caller faces language barriers during emergencies, regardless of how uncommon their primary language might be within the jurisdiction.

![Language support tiers](https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/f2caa214-9521-49bd-87b3-95ac11c2179d/inline-2-1771489004639.jpg)

Translation language translation platforms must also accommodate regional variations and dialects. Spanish speakers from different countries use distinct terminology for medical conditions, body parts, and emergencies. Systems must recognize these variations to provide accurate translations that responders can trust.

## Quality Assurance in Emergency Translation Language Translation

Accuracy in translation language translation directly impacts emergency outcomes. A mistranslated address, misunderstood medical condition, or incorrectly communicated threat level can have life-threatening consequences. Quality assurance mechanisms must operate in real-time without introducing unacceptable delays into emergency communications.

| QA Mechanism | Implementation Method | Emergency Application |
| --- | --- | --- |
| Confidence Scoring | AI-based reliability rating | Flags low-confidence translations for human review |
| Back-translation | Secondary translation to source language | Validates critical information accuracy |
| Contextual Analysis | Semantic meaning verification | Ensures emergency context preservation |
| Human Oversight | Interpreter escalation protocol | Provides backup for complex scenarios |
| Post-incident Review | Translation audit and analysis | Identifies system improvement opportunities |

Studies on [translation validation methodologies](https://arxiv.org/abs/2004.10361) reveal common error patterns in machine translation systems. For emergency services, these errors often cluster around proper nouns (addresses, medication names) and idiomatic expressions describing pain or distress. Advanced translation language translation platforms implement specialized error detection for these high-risk categories.

### Continuous Improvement Through Analytics

Translation language translation systems generate vast amounts of data with each emergency interaction. Forward-thinking agencies leverage this data to continuously refine translation accuracy and identify emerging language needs within their communities.

Analytics capabilities should track:

1. Translation accuracy rates by language pair
2. Common mistranslation patterns requiring correction
3. Response times for various language requests
4. Caller satisfaction with translation services
5. Integration performance with dispatch systems

The [field of translation](https://www.convey911.com/blog/field-of-translation) continues evolving, with emergency communications driving innovation in real-time processing and specialized terminology handling.

## Implementation Strategies for Emergency Agencies

Deploying translation language translation services requires careful planning that addresses technical, operational, and training considerations. Successful implementations balance technological sophistication with practical usability for [call takers](https://www.convey911.com/blog/call-takers) and dispatchers working under pressure.

### Phased Deployment Approach

Agencies should adopt staged implementation strategies that minimize disruption while building organizational confidence in translation language translation systems. A typical deployment sequence includes:

**Phase 1: Assessment and Planning (2-3 months)**

- Analyze call volume data by language
- Evaluate existing infrastructure compatibility
- Define success metrics and performance standards
- Develop training curriculum for dispatch personnel

**Phase 2: Pilot Implementation (3-6 months)**

- Deploy system for top 3-5 languages
- Monitor performance and gather user feedback
- Refine workflows based on real-world usage
- Document lessons learned and best practices

**Phase 3: Full Deployment (6-12 months)**

- Expand to comprehensive language coverage
- Integrate advanced features (video, multimedia)
- Implement quality assurance protocols
- Establish continuous improvement processes

**Phase 4: Optimization (Ongoing)**

- Analyze performance data for refinement opportunities
- Update language databases with local terminology
- Expand integration points with additional systems
- Enhance training based on operational experience

Understanding [how translation language services integrate](https://www.convey911.com/blog/translation-language-services) into broader emergency communication ecosystems helps agencies anticipate challenges and plan appropriate resources.

![Implementation timeline](https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/f2caa214-9521-49bd-87b3-95ac11c2179d/inline-3-1771489009151.jpg)

## Training and Organizational Change Management

Introducing translation language translation technology requires more than technical implementation. Dispatch center culture, established procedures, and individual comfort with technology all influence adoption success. Comprehensive training programs address both system operation and the broader communication skills needed for effective multilingual emergency response.

Training should encompass:

- **Technical proficiency**: System navigation, feature activation, troubleshooting
- **Communication best practices**: Speaking clearly for translation, confirming understanding, managing translation delays
- **Cultural competence**: Understanding how different cultures interact with emergency services
- **Quality verification**: Recognizing potential translation errors, escalation procedures
- **Documentation requirements**: Recording translated interactions, maintaining audit trails

The most successful programs incorporate scenario-based training where dispatchers practice using translation language translation tools during simulated emergencies. This hands-on approach builds confidence and reveals workflow issues before they impact actual emergency responses.

## Specialized Applications Beyond Voice Translation

While voice communication remains fundamental to emergency response, modern translation language translation platforms extend to multiple communication modalities. Text-based emergency services, video relay for deaf and hard-of-hearing callers, and multimedia message handling all require translation capabilities adapted to their specific formats.

Text-based translation presents unique challenges because written emergency communications often lack the contextual clues present in voice conversations. Systems must infer urgency, emotion, and intent from text alone while processing abbreviations, misspellings, and autocorrect errors common in mobile messaging.

Video translation adds visual context but introduces bandwidth and processing complexity. Emergency video calls may include sign language interpretation, visual documentation of injuries or crime scenes, and location verification through visual landmarks. Translation language translation for video must process both spoken content and visual information simultaneously.

For organizations managing multilingual teams in high-pressure environments, tools like [Tasa.app](https://tasa.app) demonstrate how picture-based instructions combined with AI translation can streamline task execution across language barriers, a principle applicable to emergency response scenarios requiring visual communication.

## Legal and Compliance Considerations

Translation language translation services in emergency contexts operate within complex legal frameworks governing language access, privacy protection, and emergency services standards. Agencies must ensure their translation systems comply with Title VI of the Civil Rights Act, Americans with Disabilities Act requirements, and state-specific language access mandates.

**Critical compliance areas include:**

- **Meaningful access**: Providing language services comparable in quality to English-language services
- **Privacy protection**: HIPAA-compliant handling of protected health information
- **Record retention**: Maintaining translation recordings and transcripts per state requirements
- **Quality standards**: Meeting accuracy thresholds defined by language access regulations
- **Non-discrimination**: Ensuring equal service delivery across all languages

Documentation of translation language translation interactions serves multiple purposes beyond compliance. These records provide evidence for legal proceedings, support quality improvement initiatives, and demonstrate the agency's commitment to language access. Platforms must balance comprehensive logging with storage capacity and search functionality for practical record retrieval.

## Cost-Benefit Analysis for Translation Language Translation Services

Emergency agencies evaluating translation language translation solutions must justify investments through clear cost-benefit analysis. While upfront implementation costs can be substantial, the long-term value includes improved emergency outcomes, reduced legal liability, and enhanced community trust.

| Cost Category | Typical Investment | ROI Considerations |
| --- | --- | --- |
| Software licensing | $50,000-$200,000 annually | Scales with call volume and feature set |
| Implementation services | $25,000-$100,000 one-time | Varies based on integration complexity |
| Training and change management | $15,000-$50,000 one-time | Ensures effective utilization and adoption |
| Ongoing support and maintenance | 15-20% of license cost annually | Critical for system reliability |
| System upgrades and enhancements | $10,000-$40,000 annually | Maintains technological currency |

Benefits extend beyond direct cost savings to include reduced response times for non-English emergencies, decreased reliance on bilingual staff availability, improved documentation quality, and enhanced community relationships. Research on [translation services cost](https://www.convey911.com/blog/translation-services-cost) structures helps agencies understand investment requirements relative to their service population and call volumes.

The alternative to dedicated translation language translation platforms often involves ad-hoc solutions like calling bilingual officers, using family members as interpreters, or attempting communication through translation apps not designed for emergency use. These approaches introduce delays, quality concerns, and potential legal vulnerabilities that structured platforms eliminate.

## Future Developments in Emergency Translation Technology

Translation language translation technology continues advancing rapidly, with several emerging capabilities poised to transform emergency communications further. Artificial intelligence, natural language processing, and computational linguistics research all contribute to increasingly sophisticated translation systems.

Near-term developments include:

1. **Emotion recognition**: Detecting stress, fear, or deception through voice analysis across languages
2. **Predictive translation**: Anticipating likely caller needs based on initial statements and context
3. **Augmented reality integration**: Overlaying translated instructions onto first responder field-of-view displays
4. **Dialect adaptation**: Automatically adjusting translations based on detected regional speech patterns
5. **Multi-party translation**: Supporting conversations among callers, dispatchers, and field units in different languages simultaneously

Studies examining [how source language traces persist in translations](https://arxiv.org/abs/1704.07146) inform improvements in naturalness and accuracy for target language output. Emergency translation language translation systems benefit from this research as they strive for translations that sound native while preserving critical information integrity.

The convergence of translation technology with other emergency innovations creates powerful synergies. Integration with automatic location identification, smart building systems, medical records, and surveillance technology enables translation language translation platforms to provide context-aware services that adapt to specific emergency scenarios automatically.

---

Translation language translation has become indispensable for modern emergency services serving diverse communities. Effective implementation requires balancing technological sophistication with operational practicality, ensuring that language differences never delay critical emergency response. [Convey911](https://convey911.com) delivers comprehensive emergency communication solutions with integrated real-time translation across 185+ languages, supporting text, multimedia, video, and location-sharing features that eliminate language barriers when every second counts.

## Related posts

[![](https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/c654d11a-68e1-435e-bbb8-dbb543e846f8/featured-1775548317671.jpg)](https://www.convey911.com/blog/english-to-all-languages-translation)

## [English to All Languages Translation: Complete Guide 2026](https://www.convey911.com/blog/english-to-all-languages-translation)

![Picture of Patrick Rife](https://app.hubspot.com/settings/avatar/d49caa125915a087c6e43ac68f945642) [Patrick Rife](https://www.convey911.com/blog/author/patrick-rife) 

 Apr 14, 2026, 12:23:30 PM

Effective communication transcends language barriers, especially in critical moments when every...

[Read more](https://www.convey911.com/blog/english-to-all-languages-translation)

[![](https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/d7127e1a-121c-458b-90ad-a2930a89d3e8/featured-1773398840176.jpg)](https://www.convey911.com/blog/speed-translation-guide)

## [Speed Translation: Accelerating Emergency Communication](https://www.convey911.com/blog/speed-translation-guide)

![Picture of Patrick Rife](https://app.hubspot.com/settings/avatar/d49caa125915a087c6e43ac68f945642) [Patrick Rife](https://www.convey911.com/blog/author/patrick-rife) 

 Apr 14, 2026, 12:20:40 PM

When seconds matter, communication barriers can mean the difference between life and death. Speed...

[Read more](https://www.convey911.com/blog/speed-translation-guide)

[![](https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/45fb60ea-7383-4de5-ba57-3da00f027b06/featured-1777022176408.jpg)](https://www.convey911.com/blog/language-interpretation-and-translation)

## [Language Interpretation and Translation for Emergencies](https://www.convey911.com/blog/language-interpretation-and-translation)

![Picture of Patrick Rife](https://app.hubspot.com/settings/avatar/d49caa125915a087c6e43ac68f945642) [Patrick Rife](https://www.convey911.com/blog/author/patrick-rife) 

 Apr 24, 2026, 5:21:24 AM

Emergency situations demand clear, immediate communication. When language barriers exist between...

[Read more](https://www.convey911.com/blog/language-interpretation-and-translation)

- [Contact Us](https://www.convey911.com/contact)
- [Request a Demo](https://www.convey911.com/request-a-demo-convey911-communications-and-language-translation)
- [Submit a Support Ticket](https://www.convey911.com/support)
- [About Us](https://www.convey911.com/about)
- [Frequently Asked Questions](https://www.convey911.com/frequently-ask-questions)
- [Read Our Blog](https://www.convey911.com/blog)
- [Privacy Policy](https://www.convey911.com/privacy-policy)
- [Terms & Conditions](https://www.convey911.com/terms-and-conditions)

- [ConveyPrizym](https://www.convey911.com/conveyprizym)
- [ConveyConnect](https://www.convey911.com/convey-connect-fast-reliable-access-to-human-language-interpreters)
- [ConveyAlert](https://www.convey911.com/convey-alert-mass-messaging-platform-with-language-personalization)
- [ConveyText-to-911](https://www.convey911.com/text-to-911-cloud-based-tcc-service-integrated-language-translation)

---

Convey911, LLC

640 Frederick Road, Floor 2

Baltimore, MD 21228

 

 

Copyright © 2026

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Patrick Rife",
    "url" : "https://www.convey911.com/blog/author/patrick-rife"
  },
  "dateModified" : "2026-03-09T08:30:00.075Z",
  "datePublished" : "2026-02-23T20:49:57.000Z",
  "headline" : "Translation Language Translation for Emergency Services",
  "image" : [ "https://xqvnmkjynbkcujcrtubi.supabase.co/storage/v1/object/public/article-images/f2caa214-9521-49bd-87b3-95ac11c2179d/inline-1-1771489004220.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.convey911.com/blog/translation-language-translation",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.convey911.com/hubfs/Convey911%20Logo.png"
    },
    "name" : "Convey911, LLC"
  }
}
```

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Patrick Rife"
  },
  "dateModified" : "2026-03-09T00:00:00-05:00",
  "datePublished" : "2026-03-09T00:00:00-05:00",
  "description" : "Learn how language translation supports emergency services by enabling accurate, real-time multilingual communication between dispatchers, first responders, and the communities they serve.",
  "headline" : "Translation Language Translation for Emergency Services",
  "mainEntityOfPage" : {
    "@id" : "https://www.convey911.com/blog/translation-language-translation",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.convey911.com/hs-fs/hubfs/Convey%20Logo%202000px-1.png?width=400&height=160&name=Convey%20Logo%202000px-1.png"
    },
    "name" : "Convey911"
  }
}
```